Sync Linear issues to Todoist tasks automatically (create, update, close)
Ready for 3.0Ready for 3.0. This template uses no nodes that n8n 3.0 removes. No removed nodes, versions or helpers found. Static check, last run 2026-10-19.
What this workflow does
This workflow has 26 nodes and runs on Linear events. Along the way it connects Todoist and Linear.
How it runs
Trigger: On Linear events.
- Switch: routes items into 3 branches
- Check if task already exists (Todoist): get many
- Check if task already exists (Todoist): get many
- If: checks a condition and branches into true / false
- If: checks a condition and branches into true / false
- Remove task (Todoist): delete
- If: checks a condition and branches into true / false
- If: checks a condition and branches into true / false
- If: checks a condition and branches into true / false
- Remove task (Todoist): delete
…plus 13 more steps. See the full node list below.
Services it uses
Before you upgrade to n8n 3.0
Nothing in this workflow is removed in n8n 3.0, so it should import and run after the upgrade.
Nodes used (7)
- Todoist
n8n-nodes-base.todoist - Linear Trigger
n8n-nodes-base.linearTrigger - If
n8n-nodes-base.if - No Operation, do nothing
n8n-nodes-base.noOp - Switch
n8n-nodes-base.switch - Linear
n8n-nodes-base.linear - Edit Fields (Set)
n8n-nodes-base.set
From the author
✨ Try It Out! Sync your Linear issues to Todoist automatically with this n8n workflow. When an issue is created, updated, or completed in Linear, a corresponding task is created, updated, or closed in Todoist. --- ⚙️ How It Works - Triggered by issue changes…