Sync Google Sheets data with MySQL
Ready for 3.0Ready for 3.0. This template uses no nodes that n8n 3.0 removes. No removed nodes, versions or helpers found. Static check, last run 2026-10-19.
What this workflow does
This workflow has 13 nodes and runs on a schedule (cron */30 6-22 * * 1-5) (plus 1 other trigger). Along the way it connects Google Sheets and MySQL.
How it runs
Trigger: On a schedule (cron */30 6-22 * * 1-5) (plus 1 other trigger).
- Google Sheet Data (Google Sheets): uses Google Sheets
- SQL Get inquiries from Google (MySQL): select
- Rename GSheet variables (Edit Fields (Set)): sets or maps fields
- Compare Datasets: uses Compare Datasets
- Add MySQL records (MySQL): create or update
- No reply too long? (If): checks a condition and branches into true / false
- DB Status assigned? (If): checks a condition and branches into true / false
- DB Status in sync? (If): checks a condition and branches into true / false
- Update GSheet status (Google Sheets): update
- Sync MySQL data (MySQL): update
Services it uses
Before you upgrade to n8n 3.0
Nothing in this workflow is removed in n8n 3.0, so it should import and run after the upgrade.
Nodes used (8)
- Manual Trigger
n8n-nodes-base.manualTrigger - Compare Datasets
n8n-nodes-base.compareDatasets - No Operation, do nothing
n8n-nodes-base.noOp - Schedule Trigger
n8n-nodes-base.scheduleTrigger - Google Sheets
n8n-nodes-base.googleSheets - MySQL
n8n-nodes-base.mySql - Edit Fields (Set)
n8n-nodes-base.set - If
n8n-nodes-base.if
From the author
This workflow performs several data integration and synchronization tasks between Google Sheets and a MySQL database. Here is a step-by-step description of what this workflow does: 1. Manual Trigger: The workflow starts when the user clicks "Execute…