Import data from MySQL into Google Sheets
Needs changesNeeds changes. This template uses 1 thing(s) that n8n 3.0 removes: Cron. 1 breaking item(s) found. Static check, last run 2026-10-19.
What this workflow does
This workflow has 3 nodes and runs on a schedule (legacy Cron node). Along the way it connects MySQL and Google Sheets.
How it runs
Trigger: On a schedule (legacy Cron node).
- MySQL: run a query
- Google Sheets: append
Services it uses
Before you upgrade to n8n 3.0
1 thing in this workflow is removed in n8n 3.0. Fix it before you upgrade:
- Cron: replace with Schedule Trigger.
| Removed in 3.0 | Replace with |
|---|---|
| Cron Cron | Schedule Trigger |
Nodes used (3)
- Cron
n8n-nodes-base.cron - MySQL
n8n-nodes-base.mySql - Google Sheets
n8n-nodes-base.googleSheets
From the author
This workflow queries a table in MySQL and inserts the data into Google Sheets.